B-Diegem: electricity
Supply of electrical energy for grid losses. Elia, in its capacity of officially designated high tension grid operator in Belgium, intends to conclude with one (or several) ARP('s) ("Access Responsible Party") an agreement for the supply of electrical energy in order to compensate the losses generated by the networks under its operation. A party approved by Elia as an "Access Responsible Party" or "ARP" is a party validly holding an "Access Responsibility Contract". This party can be a supplier, a consumer or a third party. The Access Responsibility Contract mainly concerns the balancing responsibilities of an ARP on the network. See also III.1.4. CPV: 09310000. ...


UK-Reading: flow-monitoring services
1024 Sewer monitoring and investigation. Thames Water intends to award framework agreements for the provision of short-term sewer monitoring, permanent monitoring and sewer investigation/survey work. These agreements will support Thames Water's multi billion pound capital programme for AMP 5. Contracts awarded under the Framework Agreements may be awarded directly by Thames Water or by one of its approved contractors or an approved sub-contractor. The supplier will be expected to offer the same levels of service and commercial benefits to Thames Water and its approved contractors and sub-contractors. For single, large scale requirements the supplier may be required to 'project manage' to ensure that all goods are supplied in a timely manner and project costs are minimised. This notice is a request for expressions of interest to participate in the bid process to establish the relevant framework agreement. Thames Water will consider how lots may be combined (if at all) subject to responses received from applicants and in particular where this is considered to offer economic advantage. Thames Water reserves the right not to award Framework Agreements for one or more lots. Applicants may apply individually and/or provide joint venture or consortium applications. It is envisaged that Framework agreements will be awarded for the duration of 2 years extendable up to a maximum of 5 years. Applications are welcome from applicants that are able to provide the above requirements in the following Lots: Lot 1 - Supply and Installation of short-term sewer monitors to measure the depth and velocity to enable flow data to be captured. Successful tenderers will supply and maintain their own sewer flow measurement equipment. The equipment must be compliant with current and future regulations for use in such environments. The equipment must be ATEX approved. Included in this Lot will be rain guages, equipment for the measurement of pumping station operation such as current clamps, pressure and surge measurement associated with rising mains. Surveys may require up to 100 monitors for any one project with scope for simultaneous projects to run in parallel; Lot 2 - Installation of permanent flow and depth monitors. Scope will include the supply and installation of permanent telemetered monitors as well as the installation of Thames Water supplied monitoring equipment. Ongoing maintenance of the permanent equipment is also required. It is anticipated that up to 500 monitors could be installed annually; Lot 3 - Sewer investigations/Site surveys. To include manhole, pumping station (including draw down tests) and ancilliary surveys (CSO etc.). Other forms of survey included in this section will be impermeability surveys, sewer network tracing and connectivity surveys. Survey work may be required in any of Thames Water's 349 sewerage treatment catchment areas. Please note the above list is not exhaustive and types of sewer monitoring and investigation may be added/removed based on project requirements in AMP 5. The successful supplier(s) are expected to offer innovative solutions and design savings for projects and challenge design specifications and technical solutions being considered for a project. Successful supplier(s) shall develop upgrade solutions as technologies/components become obsolete. CPV: 71631440, 38421000, 38425300, 90491000, 71352000. ...


UK-Felixstowe: cleaning services of transport equipment
Provision of steam cleaning services at the port of Felixstowe and London Thamesport. Provision of steam cleaning services at the port of Felixstowe and London Thamesport. CPV: 90917000. ...


DK-Fredericia: poles for carrying overhead lines
Pre-qualification for DK-Kassø-Tjele, delivery of monopiles for 400 kV overhead line. Approx. 80 monopiles for 400 kV overhead line. Welded tubes with a diameter of 2 m and up, length from 12 m., thickness from 27 mm. CPV: 44212224, 44212225, 44212250, 44212200, 44212227, 44212230. ...


F-Paris: insurance and pension services
Inelfe – insurances for electrical interconnection project between France and Spain (broker AON). Contractualization of insurance policies (construction all risks and third party liability and any others that may be required for the project) for electrical interconnection project between France and Spain through broker AON (contact mentionned in annex). CPV: 66500000, 66000000. ...


NO-Oslo: repair and maintenance services
MA2401-3/11E Annual prior information notice, works. This is an annual prior information notice only. Concrete purchases will be published separately and successively throughout the year. CPV: 50000000, 31000000, 51000000, 71000000, 90000000. ...


NO-Leikanger: construction work for bridges and tunnels, shafts and subways
County road 609 Dalsfjordbrua - contract BRU-01 concrete work. The main element is concrete work for the 523 m long suspension bridge, Dalsfjord bridge. 100 m high tower with 3 bars. 4 guy-wire anchor plates and 4 anchor blocks for cables. Viaduct length north/south of 75/25m. Bridge width 10 m. Note: to register your interest in this notice and obtain any additional information please visit the Doffin web site at http://www.doffin.no/Search/Search_Switch.aspx?ID=222027. CPV: 45221000. ...


NO-Leikanger: construction work for bridges and tunnels, shafts and subways
County road 609 Dalsfjordbrua - contract BRU-02 Steel and assembly works. The main element is the delivery and assembly of the 523 m long stiffening supporter (steel box) and joints as well as the assembly of carrier cables, upper suspension rod fasteners and suspension rods. The contract also consists of damp proofing and the wearing course for the whole of the bridge. Note: to register your interest in this notice and obtain any additional information please visit the Doffin web site at http://www.doffin.no/Search/Search_Switch.aspx?ID=222081. CPV: 45221000. ...


NO-Ski: primary school construction work
Siggerud school and Siggerud nursery, turnkey contract. A new school and nursery shall be constructed in Siggerud. The contract is a turnkey contract and the contractor's continued work shall be based on the basis material which is enclosed with the tender documents. The assignment consists of engineering design services as well as all the construction works and deliveries for a completed building ready for use including outdoor installations within the contract border, as well as conveying and connecting with technical public installations which are outside the contract border. It is desirable that the contract works are started with engineering design services immediately after the contract has been signed. The provisional main progress plan for the project is enclosed with the tender documents. Note: To register your interest in this notice and obtain any additional information please visit the Doffin Web Site at http://www.doffin.no/Search/Search_Switch.aspx?ID=221783. CPV: 45214210. ...


NO-Oslo: radio, television, communication, telecommunication and related equipment
MA2401-1/11E annual prior information notice, supplies. CPV: 32000000, 09000000, 15000000, 18000000, 22000000, 30000000, 31000000, 34000000, 35000000, 39000000. ...