I-Milan: pipeline-inspection services
Greenconnector Project - HVDC link between Italy and Switzerland – Pipeline inspection activities. Inspection of some sections of an out of service pipeline for the purpose of getting accurate and reliable geometrical data of the same pipeline. CPV: 76600000. ...


UK-Treharris: construction work for water projects
Minor civil engineering works framework. DCC intends to establish frameworks within 3 predetermined geographical areas for the provision of minor civil engineering works on DCC water and waste water assets including production, distribution and network assets. These areas will be area 1 north Wales; Area 2 south east Wales and area 3 south west Wales. This work will include working with DCC and its main partners to deliver planned capital maintenance activity; general civil engineering activity; sewer rehabilitation and gravity pipeline work and Traffic Management Act submissions across water and waste water assets. Individual work packages procured through this framework will generally range from 10 000 to 250 000. This notice is a request for expressions of interest for inclusion on the list of applicants to be invited to tender for this framework. Applicants wishing to participate in the tender process will be required in the first instance to pre-qualify by completing and submitting a pre-qualification questionnaire. CPV: 45240000, 45232152, 45231300, 45232431, 45232423, 45232400. ...


UK-Belfast: hand tools
Supply of fastners, tools and associated consumables. Translink operate a fleet of 1 400 buses and coaches and 150 railway vehicles across Northern Ireland. These are maintained in workshops in the greater Belfast Area and garages across Northern Ireland. Translink requires a competent contractor(s) to provide the following: A break down of the product ranges with estimated spend (based on historical usage) is as follows (Note that as many of the existing products can be used for several tasks the annual values have been estimated): Lot 1 fasteners translink require a range of fastener products. The successful supplier will have to provide industrial storage cabinets to contain the fasteners range supplied via direct line feed. Annual spend 50 000 GBP; Lot 2 electrical consumables translink require a range of electrical consumables such as bulbs, fuses, cables and connectors. The successful supplier will have to provide industrial storage cabinets to contain the range supplied via direct line feed. Annual spend 100 000 GBP; Lot 3 hand tools and tool consumables translink require a range of hand tools and tool consumables such as screwdrivers, spanners, drill bits and grinding discs. Annual spend 200 000 GBP; Lot 4 electric power tools translink require a range of electric power tools such as drills, grinders, jigsaws. Annual spend 100 000 GBP; Lot 5 air tools and accessories translink require a range of air tools and accessories such as air drills, rivet guns, air wrenches, hoses and fittings. Annual spend 100 000 GBP; Lot 6 welding accessories and consumables translink require a range of welding accessories and consumables such as welding rods, welding wire and associated welding PPE. Annual spend 50 000 GBP. The initial contract will be for a period of 3 years with options to extend for a further 2 periods of 1 year each. CPV: 44511000, 44530000, 31680000, 43830000, 42651000, 44315100. ...


I-Rome: engineering studies
Frame agreement engineering studies and other services for Tempa Rossa Project. The Contracting Entity launches the present European Union tender process with the purpose to award frame agreements for engineering studies and other services for the needs of Tempa Rossa Project. The publication of the pre-qualification questionnaire is made together with the present bidding notice. The Contracting Entity intends to select the candidates with such pre-qualification questionnaire (see web site: www.it.total.com). Selection criteria and scores are explained in such pre-qualification questionnaire. If a large number of candidates pass the pre-qualifcation phase, the Contracting Entity would invite the eight candidates with the highest scores to tender. Contracting Entity will select, through a negotiating procedure based on the lowest price criteria, three signatories of frame agreements ("contract"); such signatories will be ranked according to the lowest price offered. The contract will regulate and define in advance the general terms and conditions among the signatories, including in particular the relevant unit prices. For the supply of work, the specific terms and conditions (including specific scope of work and quantity) will be part of the work orders awarded case by case containing: 1. a detailed scope of work for the specific requested services; and 2. a defined time schedule, the overall consideration due being the result of the multiplication of the required amount of time by the price rate as originally defined in the frame agreement. The further negotiation between the Contracting Entity and the three frame holders will be handled as follows: — A request for quotation is sent by the Contracting Entity to the frame holder "1st position", — Company will negotiate with this frame holder only the schedule/timing and the volume of work, — If the 1st frame holder proposal meets the Contracting Entity requirements (based on the Contracting Entity internal evaluation of the volume of work), a work order will be awarded to him. If not, the Contracting Entity will request a proposal to the frame holder "2nd position", — If such second frame holder proposal does not meet the Contracting Entity requirement, the Contracting Entity will ask to the third Frame Holder. After each work order completion, the Contracting Entity will assess the supplier of the requested services (deliverables quality, schedule, etc). If the assessments are not satisfactory, the Contracting Entity will have the right to change the ranking order between the three frame holders, and the subsequent work order will follow the new ranking. CPV: 71335000, 71340000, 71336000, 71350000. ...


SE-Gothenburg: surveillance system
Integrated Control & Safety System (ICSS). The ICSS will provide the monitoring, control and safety functions for the GoBiGas 20 MW plant in Gothenburg, Sweden. CPV: 35125000, 42961000, 51900000. ...


SE-Gothenburg: pressure vessels
SS/CrMo reactors. 11 SS/CrNo reactors for the GoBiGas 20 MW project in Gothenburg, Sweden. CPV: 44615000, 44610000. ...


NO-Stranda: construction work for school buildings
Sunnylven School, Stranda municipality, Norway. The contract includes works such as new building works and renovation of Sunnylven primary and lower secondary school located in Hellesylt. The contract shall be executed as principal contract with transfer of disciplines. The project is divided in 3 sub-projects included in the principal contract. Sub-project I, Sunnylven School with outdoor areas: This mainly includes the sub-project restoration works with new technical installations. Sub-project II, Sunnylven community centre with outdoor areas: New installation with accompanying construction works for buildings. Sub project III, locker room facility – swimming pool: Restoration of swimming pool with construction of new locker room facility as well as installation works in connection with technical disciplines. All sub-projects with accompanying outdoor areas. For overview see the site plan attached the tender publication in Doffin. CPV: 45214200. ...


NO-Oslo: ventilation installation work
2011/6225 ventilation work Oslo University Hospital are about to start comprehensive construction and renovation works as well as alterations to the hospital's area. The need for continual operation of the hospital's departments means that Oslo University Hospital will establish framework agreements for the execution of these constructional and technical works. Note: to register your interest in this notice and obtain any additional information please visit the Doffin Web Site at http://www.doffin.no/Search/Search_Switch.aspx?ID=229376. CPV: 45331210. ...


NO-Tønsberg: railway construction works
The Fibo contract, UHN-06. The Fibo contract is a tunnel contract with a length of approx. 2 km. This is a part of the development of double track railway from Holm – Nykirke in Vestfold. The Awarding Authority is the Norwegian National Rail Administration. Note: to register your interest in this notice and obtain any additional information please visit the Doffin Web Site at http://www.doffin.no/Search/Search_Switch.aspx?ID=229245. CPV: 45234100. ...


NO-Tønsberg: railway construction works
UHN-04, the station contract. The station contract is a tunnel contract with a length of approx. 2 km. The Station hall is in rock and situated in Holmestrand. This is a part of the development of double track railway from Holm – Nykirke in Vestfold. The Awarding Authority is the Norwegian National Rail Administration. Note: to register your interest in this notice and obtain any additional information please visit the Doffin Web Site at http://www.doffin.no/Search/Search_Switch.aspx?ID=229267. CPV: 45234100. ...