15/03/2012 tenders 180

B-Brussels: parts of gas generators
Rotor repair of a GEC Alstom generator: 1996 T255-40 CCO300 470 MVA H2 and stator water cooled generator. Delivery and replacement of the 2 retaining rings and all rotor wedges for the GEC Alstom generator: 1996 T255-40 CCO300 470 MVA H2 and stator water cooled generator. Location: powerplant Ringvaart, Buitenring Wondelgem 10, 9000 Gent, BELGIUM. CPV: 31161800, 31161000, 51111200, 50532300, 31120000. ...


UK-Belfast: construction work
07-25 Runway Rehabilitation Project Refurbish existing main runway 07-25 by resurfacing and carrying out other associated works. CPV: 45000000, 45200000, 45230000, 45235000, 45235100, 45235110, 45235111, 45235200, 45235210, 45235300. ...


SE-Stockholm: isolating switches
Automation for remote controlled disconnectors. Fortum Distribution will in the next coming years increase the network automation by installing pad-and pole-mounted disconnectors that have remote control and automation. This procurement cover the establishment of a frame agreement concerning the following equipment: Automation for disconnectors 10-30 kV, pole-and padmounted, with autoself functionality. Note that Secondary substations and disconnectors are not part of the scope. CPV: 31214110, 45315100, 45317000. ...


IRL-Dublin: closed-circuit television cameras
CE3803. Long term supply of DOO CCTV monitors. Iarnrod Eireann will shortly be seeking tenders for the long term supply of driver only operated (DOO) CCTV monitors. There are currently 168 DOO monitors installed throughout the IE network. It is intended to replace these monitors over the next 5 - 7 years on an "as required" basis. There may also be a requirement for additional monitors as part of renewals works or new projects. It is intended that the initial supply will be for 10 monitors only and that additional monitors will be replaced on an "as required" basis. Note: to register your interest in this notice and obtain any additional information please visit the eTenders web site at http://www.etenders.gov.ie/Search/Search_Switch.aspx?ID=379753. CPV: 32234000. ...


UK-Hounslow: business and management consultancy and related services
BAA/002472 - Consultancy & Advisory Services. Provision of consulting & advisory services in two distinct lots: Lot 1: Management Consultancy Services. Lot 2: Finance Consulting & Advisory Services. CPV: 79400000, 79410000, 79411000, 79412000. ...


F-Coquelles: railway and tramway passenger coaches, and trolleybuses
Studies to estimate the residual life cycle of the Tourist Shuttle Carrier Wagons. On the basis of the original calculation notes and vehicle drawings, the mission consists of the realisation of a complete study to provide a forecast of the residual life cycle of the Tourist Shuttle Carrier Wagons. Objective: Determine the date limit for the Operational Service life of the Tourist Shuttle Carrier Wagons. — Identification of the main zones and critical elements potentially affecting the global resistance of the frame structure, — Characterisation of the existing disorders and analysis of future risks, — Definition of the actual aging process and deterioration, — Determination of the life cycle of identified areas, systems and elements, — Determination of the impact on the life cycle of these various areas / systems / elements after the implementation of a Midlife overhaul / repair, — Proposal of "modus operandi" of the Overhaul / Repair process, — Assessment of economic viability according to the types and timescales of the proposed repairs, unit costs etc, — Establishment of a procedure for implementation which will monitor the wagons to the end of their operational service life. This study concerns: — the simple deck carrier (SDC), — the double deck carrier (DDCA), — the double deck carrier (DDCS) with toilet and staircase. CPV: 34622000, 60200000. ...


DK-Fredericia: works for complete or part construction and civil engineering work
Pre-qualification regarding protection of the Lillebælt Submarine Cables. Protection of the Lillebælt Submarine cables, via trenching and jetting. CPV: 45200000. ...


UK-Belfast: natural gas
Contract gas supply for Castlereagh Borough Council 2013. Supply of natural gas to various Council properties. CPV: 09123000. ...


UK-Liverpool: construction work
Principal contractor framework agreement in relation to the development of "Liverpool 2" (Liverpool's new deep water container terminal), Port of Liverpool, United Kingdom. The contracting entity plans to build "Liverpool 2" (Liverpool's new deep water container terminal) which will be located adjacent to the Royal Seaforth Dock at the Port of Liverpool ("the scheme"). The scheme comprises the construction of a new quay wall of the following approximate dimensions - 850m length x 30m height. The quay wall will enclose an area of reclaimed land which will be surfaced to form a container terminal area of approximately 22 hectares. A berthing pocket will be dredged in front of the new quay wall, from which it is anticipated that approximately 1 000 000 m3 of dredged material will be removed. It is also anticipated that approximately 2 500 000 m3 of suitable dredged material obtained from a variety of sources will be used as infill for the reclaimed area of land behind the new quay wall. The Scheme will also include improvements to the existing Port infrastructure, the acquisition by the contracting entity of plant and equipment including cranes, container carriers and road trains, and the construction of new buildings and the installation of security systems. It is anticipated that the quay wall construction, dredging and backfilling works will be awarded to one economic operator (the "Quay Wall Contractor") under a separate contract which is the subject of a separate contract notice issued by the contracting entity. This contract relates to setting up a framework agreement under the terms of which the contracting entity may "call-off" various works and services including "supervisory/project management" services, "advance" works and "ancillary" works, further details of which are set out below: The "supervisory/project management services" may include (without limitation) the following: — advising the contracting entity on overall project buildability issues, logistics, health and safety, "lay down" areas, welfare, design, procurement, security and general site/project management and housekeeping, — undertaking the role of principal contractor under the CDM regulations, — advising the contracting entity on variant bids for the Quay Wall Contractor package (if applicable), — managing the storage and delivery arrangements of plant, equipment and materials required in connection with the scheme, — undertaking any inspections of plant, equipment and/or works required in connection with the scheme, — assisting the contracting entity in the appointment of the Quay Wall Contractor, — programming, planning, co-ordinating and supervising any contractors and/or consultants engaged by the contracting entity in connection with the scheme, — integrating with the contracting entity's in-house project team and external advisors, — assisting the contracting entity with the procurement of, and managing the installation of, quayside cranes and container handling equipment, — assisting the contracting entity in the management and co-ordination of the Scheme, which will be undertaken within the constraints of an operational port environment under the obligations of ISPS (International Ships Port Security), — supporting and/or managing the installation, testing and commissioning of plant and equipment and undertaking various post-completion matters including assisting in the development of maintenance processes and protocols, — providing such other services as may lie within the economic operator's expertise so as to assist the contracting entity in developing and delivering the scheme. The "advance" works may include (without limitation) the following: — site clearance and removal of unsuitable materials, — protection, diversion and/or abandonment of site services, — construction and decommissioning of temporary access roads, — provision and maintenance of site accommodation and welfare facilities, — provision of site security and access, — providing temporary power supplies and other services and maintenance of the same throughout the scheme, — works that may be required to assist in the relocation of existing tenants, — site storage and compound, — provision of plant and equipment for loading and off-loading goods and materials. The "ancillary" works may include (without limitation) the following: — providing and installing quay wall furniture and fenders, — surfacing works required in connection with the scheme, — rail foundations (ground bearing and/or piled), — construction of buildings including (without limitation) maintenance workshop, amenity block, car parking facilities, border control and inspection facilities, — surface water drainage systems, — improvement works to the existing port infrastructure, — providing such other works as may lie within the economic operator's expertise so as to assist the contracting entity in developing and delivering the scheme. Having regard to the above, it is anticipated that the successful economic operator will have, or will have within a joint venture or consortium arrangement, civil engineering, contracting, project management and supervision experience in connection with equivalent schemes. Important - interested parties should be aware that the successful tenderer (and companies within its group), whether acting independently or within a joint venture or consortium arrangement, will be required to supervise the Quay Wall Contractor. It is anticipated that this contract will be awarded prior to the negotiation stage of the Quay Wall Contractor tender. In the event that this contract is awarded to a bidder participating in the Quay Wall Contractor tender, the successful bidder will be required to withdraw from the Quay Wall Contractor tender before it can accept this contract. CPV: 45000000, 45100000, 45110000, 71000000, 71500000, 71541000, 71540000, 71520000, 71320000, 45200000, 45210000, 45220000, 45300000, 45213340, 45340000, 45111200, 45112340, 45113000, 45111290, 71250000, 98362000, 71317200, 79418000, 45233120. ...


NO-Elverum: construction work for subsidised residential accommodation
Extension to Vestad school with a competence unit. Educational competence unit for pupils aged 6-15 years who require help. To be established as an extension to the existing school. The extension is to consist of a respite care unit with 6 flats, an activity rooms and a snoezelen room for the weakest functioning pupils, as well as an administration part with offices. The extension is to be constructed as a low energy standard in accordance with the Project Report no. 42 – Sintef. The contract form is joint lots. The estimated cost is 45 000 000 – 50 000 000 NOK. Areas: Basement: 1 170 m2 gross, ground floor: 1 647 m2. Alterations in the existing building: 325 m2. Estimated value excluding VAT: Range: between 45 000 000 and 50 000 000 NOK CPV: 45215210. ...