MK-Skopje: natural gas
Procurement of seven (7) metering regulation stations (MRS) with capacity of 100 nm3/h, four (4) MRS with capacity of 500 nm3/h, one (1) MRS with capacity of 1 000 nm3/h, one (1) MRS with capacity of 2 500 nm3/h, one (1) MRS with capacity of 22 500 nm3/h for ТО West Skopje, and one (1) main MRS with capacity of 30 000 nm3/h for distribution gas pipeline and connection of TAV airport, Logistics Center and Pekabesko. Design, manufacturing, assembly, testing and examining in factory, including the impulse lines, on-the-spot connection of the cables between the computer for measuring of flow, PLC (programmable controller) and the valves electrical plants, supervision of field installation, supervision and commissioning, field training for operation of control devices, spare parts necessary for two years after the expiry of the warrantee period and delivery of documentation for seven (7) metering regulation stations (MRS) with capacity of 100 nm3/h, four (4) MRS with capacity of 500 nm3/h, one (1) MRS with capacity of 1 000 nm3/h, one (1) MRS with capacity of 2 500 nm3/h, one (1) MRS with capacity of 22 500 nm3/h for ТО West Skopje, and one (1) main MRS with capacity of 30 000 nm3/h for distribution gas pipeline and connection of TAV airport, Logistics Center and Pekabesko. CPV: 09123000. ...
No comments:
Post a Comment