F-Paris: energy meters
Industrial gas meters. Supply of industrial gas meters. Diaphragm, rotary and turbine gas meters. 4 subsidiaries of GDF Suez participate through this tender: Gaz réseau Distribution France - GrDF (France); SPP-distribúcia a.s. (Slovakia); Egaz-Degaz (Hungary) and GRT gaz (France). CPV: 38551000. ...


UK-Treharris: investment management software package
Asset Investment Planning Solution. The selected supplier to DCC will have experiencing in providing an "Off the Shelf" asset investment planning module to utility organisations. The module will help DCC to make decisions on investments in it's physical assets and ensure that DCC makes investments that provide the best value for money whilst maintaining customer service levels. CPV: 48411000, 72212411. ...


UK-Manchester: works for complete or part construction and civil engineering work
UK-Greater Manchester: Leigh to Ellenbrook Guided Busway. Transport for Greater Manchester (TfGM) wishes to let a contract for the detailed design and construction of the Leigh to Ellenbrook Guided Busway (LEGB). The LEGB is a complimentary section of the Leigh-Salford-Manchester busway. This is a high quality public transport corridor that provides bus priority for services linking in to the regional centre. The LEGB works are covered by the Transport Works Order – The Greater Manchester (Leigh Busway) Order 2005 (Statutory Instrument 2005 No. 1918) that came into force on the 3rd August 2005. Leigh to Ellenbrook Guided Busway utilises the former and disused rail corridor that runs approximately 7 km between Leigh town centre, at East Bond Street, and Newearth Road, Ellenbrook close to the A580, Manchester, UK. The scheme guideway works generally comprises: — approximately 7 km of off-highway dedicated guided bus lanes in each direction for vehicles adapted with kerb guidance technology, — associated bridges, structures, drainage, service diversions and fencing, — a number of fully accessible bus stops along the corridor, with provision for transport systems including but not exclusively, shelters, CCTV, helps points and rtpi at east bond street, holden road, tyldesley west, tyldesley interchange, hough lane, sale lane and newearth road, — 2 dedicated park and ride sites at the east bond street stop and at tyldesley interchange, — a number of new traffic signal controlled junction where the busway connects to and crosses the existing public highway including east bond street, holden road, well street, hough lane and sale lane, — connection to existing traffic signal controlled junctions where the busway crosses and connects to the existing public highway including connections at astley street and newearth road, — combined multiuser recreational track footpath/cycle path / horseway, — a number of crossing points in order to maintain existing footpaths and rights of way, — environmental mitigation works, — landscaping works, — ecology, — public highways lighting, — CCTV coverage of the guideway, — associated accommodation works. Advance works have been completed in 2010 on the junctions at Sale Lane and Newearth Road. The estimated value of construction works included in the contract is approximately 30 000 000 GBP (excluding VAT). A reference indicative design will be available at tender stage. Consequently, the design and construction of the contract will be based on the NEC Engineering and Construction Contract - Option A or C with appropriate amendment and the contractor will take full responsibility for the design details prepared before and after contract award. The contractor will be required to retain responsibility for design and construction related defects for a minimum period of 2 years from the issue of a completion certificate. After the selection of tenderers, TfGM intends to follow a negotiated process to involve tenderers as early as possible and to limit the need for assumptions and clarifications in the target price at the final tender submissions stage. An indicative programme for the process is set out in the prequalification information referred to in III.2.1 below. CPV: 45200000, 45223320, 45230000, 71322000. ...


IRL-Cork: public relations consultancy services
Public Relations Consultancy Services for the Networks business of Bord Gáis Éireann. Bord Gáis Networks wishes to procure certain PR Consultancy Services to provide support to an internal team. Successful tenderers will be appointed to the Bord Gáis Networks Framework for Public Relations Consultancy for a period of three (3) years, with the option to extend for a further one (1) year, up to a maximum of two (2) years, subject to an annual review after the three (3) year period and at the sole discretion of Bord Gáis Networks. It is anticipated that the contract will begin in February 2012. The contracts to be awarded under this competition are divided into two Lots: Lot 1 – Public Relations Consultancy Services – Republic of Ireland. Provision of services to include: Media Relations and Corporate PR, Crisis Communications, Public Affairs, Event and Sponsorship Management. Lot 2 – Public Relations Consultancy Services – Northern Ireland. In order to receive the pre-qualification questionnaire, please forward your expression of interest for the attention of the Networks Procurement Manager to cwhite@bge.ie. NOTE: To register your interest in this notice and obtain any additional information please visit the eTenders Web Site at http://www.etenders.gov.ie/Search/Search_Switch.aspx?ID=309652. CPV: 79416200. ...


SE-Sundbyberg: parts of electricity distribution or control apparatus
Working in the vicinity of live parts. 2011/347. Svenska Kraftnät has during the latest years been working with exchanging old shield wires. The old shield wire is Fe-lines and can have problems with damages from vibrations; these damages could result in shield wire rupture. Other damages that can be encountered are damages on clamps and brackets for example damages on axis and enlarged openings on extension links. The 400 kV Overhead line CL4 between Laforsen and Bäsna is built in the beginning of 1960's. In the beginning of 1990's some restoration work was done such as control of joints, exchange of vibration dampers and spacers on phase conductor. The overhead line between Laforsen and Bäsna has 2 existing shield wires; one of the shield wires is already exchanged to OPGW line, while the other shield wire now needs to be replaced. There will be no possibilities for dead working during exchange of shield wire and therefore the work has to be performed as working in the vicinity of live parts. CPV: 31230000, 50532400, 51112100. ...


UK-Liverpool: cooling and ventilation equipment
Supply and installation of cab air conditioning for Class 507 and 508/1 Trains for Merseyrail Electrics (2002) Ltd. Merseyrail Electrics (2002) Ltd ("Merseyrail") are looking to appoint a supplier to supply and install cab air conditioning within their Class 507 and 508/1 trains. Merseyrail's fleet comprises 59 units, used for suburban stopping services, with about 20 % of the journey in tunnels. Each unit consists of 3 coaches with a cab at each end of the unit. Currently there is no air conditioning installed within these units, however, the driver currently has an electric fan heater, a cooling fan and a sliding window. The air conditioning will need to be designed to give the driver a pleasant, cool environment without having to have the window open. The air conditioning will be expected to replace the cooling fan, but not the heater. Merseyrail requires the successful bidder to supply and install the required air conditioning equipment. Training on how to use and maintain the equipment will also be required by the successful bidder. The full specification including the standards that need to be met and the approval requirements will be provided at tender stage. Please note, installation will be required to take place at Merseyrail's depots at Birkenhead North and / or Kirkdal, North West of England. The successful bidder may be required to install the equipment out of normal working hours including evenings and weekends. Further details on Merseyrail Electrics (2002) Ltd are provided at section VI.3. CPV: 42500000, 42512000, 42512400, 42510000. ...


IRL-Dublin: repair and maintenance services of vehicle brakes and brake parts
Vehicle repair and maintenance service. Bus Eireann is tendering for vehicle repair and maintenance services. It is the intention of the Contracting Authority to set up a number of strategically located panels in the Republic of Ireland to provide the services, on demand, for a period of three (3) years with an option to extend the duration for a further 12 or 24 months at the discretion of the Contracting Authority. Even though these panels are being set up within each BE region, there is a requirement for each panel to be drawn on by other regions, especially in the event of a vehicle breakdown. There are 3 elements to this contract, as follows: — Lot 1: repair and maintenance services in accordance with original equipment manufacturers and/or bus Eireann specifications and standards to various fleet types. The service will also include towing and recovery services (as required). The services will be available during normal working hours and outside normal working hours. This will include A, B, and C dock inspections, — Lot 2: bodywork and associated services in accordance with original equipment manufacturers specifications to various fleet types. The services will be available during normal working hours and outside normal working hours. All paint workshops should be covered by the necessary relevant certification, — Lot 3: chassis and chassis electrical maintenance per the original equipment manufacturers specification for various fleet types during normal working hours and outside normal working hours. Service providers can apply for one or more lots or one or more panel(s). In order to be considered, there is a requirement to complete the attached pre-qualification questionnaire (PQQ) which can be downloaded through this website or can be requested from the named contact person on this notice. Note: To register your interest in this notice and obtain any additional information please visit the eTenders web site at http://www.etenders.gov.ie/Search/Search_Switch.aspx?ID=309672. CPV: 50116200, 50116300, 50116400, 50000000, 50100000, 50110000, 50112110, 50113000, 50113100, 71314100. ...


IRL-Dublin: internet network
Supply of passenger Wi-Fi services on existing buses. Bus Eireann proposes awarding a Contract for the supply of a turnkey managed solution to cover installation, hardware maintenance, software maintenance and end user support. All equipment must have already been deployed in a bus environment within the EU. Bus Eireann invites companies with experience in the provision of Wifi services to apply for this project. The initial project will cover approximately 300 buses in the Greater Dublin Area (GDA) and Gateway cities but responses should reflect the potential for outfitting the entire fleet of up to 700 buses. Note: To register your interest in this notice and obtain any additional information please visit the eTenders web site at http://www.etenders.gov.ie/Search/Search_Switch.aspx?ID=314532. CPV: 32412110, 72000000, 72212200, 72212220, 72212221, 72400000, 72411000, 72420000, 72421000. ...


UK-Reading: non-hazardous refuse and waste treatment and disposal services
1029 Integrated waste management To provide a waste disposal service for waste produced by operational sites (excluding sludge) for Thames Water Utilities Ltd across the whole Thames Water region. Operational sites include: Water treatment works and water treatment pumping stations, sewage treatment works and sewage pumping stations. The waste will be allocated to individual Lots as follows: LOT 1: Screenings (EWC 19 08 01) (Plastic material some sewage). LOT 2: Grit (EWC 19 08 02) (Grit washed into sewers some sewage). LOT 3: General Waste (mixed municipal) (EWC 20 03 01) (office waste may vary). LOT 4: Bundled waste streams. Recyclable Waste (paper, plastic, cardboard, alumimium cans) (EWC 15 01 01). Hazardous (for example including but not limited to fluorescent tubes, paint, batteries, WEEE waste, etc). Oil (and associated oil waste for example: oily rag, oily granule waste). Scrap metal waste (EWC 20 01 40). "Green" waste (produced by Water treatment works). "Fly tipping" (a mix of general waste may include white goods). Skips and/or specialist containers will be required (appropriate to waste type) for storage and/or waste disposal from TW operational sites. For example: Screenings and grit - open skips (if collection is offered by grab lorry skips will also be required for storage at the majority of sites). General waste - wheelie bins. Recylables - wheelie bins. Hazardous - container according to waste type. Oils are collected in drums/IBCs provided by TW but a specialist container will be required for oily rags/spill kits/granules. CPV: 90513000, 90500000, 34928480, 44613800. ...


NO-Oslo: installation services of special-purpose machinery and equipment
Mechanical engineering contract, Midgardsormen. Mechanical engineering equipment shall be delivered and assembled for the establishment of a new pump station at Bekkelaget treatment plant. The contract includes, among other things, four large emptying pumps with capacities of 1 000 l/s, four propeller pumps each with a capacity of 2 000 l/s, some smaller drainage and dry weather pumps as well as pipes and valve arrangements for lifting the sewage water approx. 20 m. Furthermore a filter installation for filtering overflow water shall be deliverd. This contract also includes regulation hatches for controlling water flow, as well as measuring equipment for registering, among other things, water levels, amounts and gas. NOTE: To register your interest in this notice and obtain any additional information please visit the Doffin Web Site at http://www.doffin.no/Search/Search_Switch.aspx?ID=240305. CPV: 51540000, 42120000, 31711400, 45231112, 51210000, 44212382. ...