NL-Amsterdam: construction works for power plants and heating plants
Heat Storage Diemen. Nuon is currently developing an extension of its existing facilities at the Diemen location, The Netherlands. The current facilities in Diemen exist of two Combined Heat and Power Plants (DM33 & DM34) and five auxiliary gas fired boilers. The extension concerns a heat accumulation tank, connected to the existing district heating supply system. For more general information on the facilities in Diemen and Nuon in general, we refer to www.nuon.com. CPV: 45251000. ...
NL-Amsterdam: architectural and related services
Interior architect for new headquarters NV Nuon Energy in Amsterdam. NV Nuon Energy (Nuon) is searching for an interior architect for the interior design of its new head quarters (Nieuw Amsterdam building - Hoekenrodeplein 1-10, Amsterdam Zuidoost). Nuon rents 26.000m2 (or more) for a period of 10 years. Expected moving date: Q4 2013. The decision model of the developer is leading in the planning of the interior designer. The interior design must be completed by the 1st of November 2012. The interior architect is to transform the building into a contemporary transparent welcoming space where people work, meet, share and have fun. The building is big and quite predictable so the interior architect is challenged to come up with surprising solutions but where "form follows function" and quality are key. The building should also allow for a "new way of working" enabling less desks, higher utilization (2000 fte, 1400 desks) and more flexibility in workplace and working hours. The whole interior should be aesthetically attractive and be based on Vattenfalls interior design look and feel concept, but tailored to the specific functional requirements defined within the project". The interior architect should come up with proposals for the different settings and the common areas in the building. The already existing floorplans/testfits will give a clear overview of what needs to be done. Next to that some special designs have to be made for the reception area, reception desk, kitchen take-out, sky lounge etc. Furthermore the interior architect will be held responsible for project management services like time management, schedules, financial control, overview and clear communication. This should all be fitted in the already agreed planning, budgets, program of requirements and follow the same flow in time. The interior design process follows a systematic and coordinated methodology, including research, analysis and integration of knowledge into the creative process. — Information phase; collect all information, do research, analysis, study program of requirements, gather best practices new way of working, in order to get a clear perspective of our goals and requirements etcetera. This phase includes development of documents, drawings and other support that outline our needs, — First proposal of artistic concept phase including a formulation of a theme, mood boards and rationale. This should include preliminary space plans (workplace concept) and two and three dimensional design concept studies and sketches that integrate our program of requirements and your knowledge of Vattenfall and the principles of interior design and the logical human behavior in a space, — Second proposal artistic concept phase; improvement of ideas. In this phase it needs to be confirmed that the preliminary space plans (workplace concept) and design concepts are safe, functional, aesthetically appropriate and meet all public health, safety and welfare requirements. This also includes company codes, accessibility, environmental and sustainability guidelines, — Third proposal. This should include Selection of colors, furniture, fixtures, equipment, materials and finishes to appropriately convey the design concept, and to meet socio-psychological, functional, maintenance, life-cycle performance, environmental, and safety requirements, — Adjustments and translation of the proposal to all spaces in the building, — Work on detailing from preliminary design to final design to final specifications (incl. technical documents detailed drawings will be made other advisors) Preparation of construction documents, consisting of plans, elevations, details and specifications, to illustrate non-structural and/or non-seismic partition layouts; power and communications locations; reflected ceiling plans and lighting designs; materials and finishes; and furniture layouts, — Support purchasing department in bidding processes in specification of furniture, fixtures, equipment including layout drawings and detailed product description; and provision of contract documentation to facilitate pricing and procurement, — Implementation, observation and reporting on the implementation of projects while in progress and upon completion, as a representative of and on behalf of the client; and conducting post-occupancy evaluation reports. This will be in collaboration with other parties involved and the build team, — Completion phase with aftercare and small adjustments, — Together with other Nuon representatives the evaluation of material / finished proposals made by the exterior architect and development company, — Joining bi-weekly / weekly project meetings (ODT meeting and if required in the build team meetings and steering committee meetings. For more information, please refer to the Tendering Guide. CPV: 71200000. ...
DK-Hvidovre: safety valves
Replacement of HP-Bypass Valves, Avedøre power plant unit 1. Replacement of HP-Bypass Valves, Avedøre power plant unit 1. — Design and manufacturing of 2 ea. Safety valves including control station, valves, measurements and all other needed accessories for regulation of the HP-Bypass system, — Design data steam: Flow 1003 m3/h, Temperature 170 °C, Pressure 314 baro, Setting press safety valve 275 bar, — Dimension of safety valves: Inlet (ODxID) 280 x 140 mm, Outlet (ODxID) Approx. 376 x 295 mm. CPV: 42131147, 42131390, 42132120. ...
UK-Swindon: accounting, auditing and fiscal services
The Provision of Energy Bureau, Risk Management, Procurement Support and Associated Services. Royal Mail Group Limited requires a contract / contracts to provide energy bureau services to validate all utility supply invoices and provide various budgeting and compliance reports. In addition, services to support Royal Mail's energy commodity risk management programme and energy procurement activities are required. CPV: 79200000, 79418000. ...
NO-Oslo: generating sets
Back-up power installations for Midgardsormen. Complete back-up power installations (1000 kVA) shall be delivered and assembled for a new pump station for Midgardsormen in Bekkelaget treatment plant. The installations shall consist of a diesel aggregate and control cupboard, assembled in an aggregate room approx. 100m from the tunnel mouth. Cooling radiator with heat exchangers and pipes from the aggregate room are led to an area outside the tunnel mouth. Option items for transformers for high voltage operation of the plant are included. Note: To register your interest in this notice and obtain any additional information please visit the Doffin Web Site at http://www.doffin.no/Search/Search_Switch.aspx?ID=259848. CPV: 31121000. ...
NO-Arendal: construction work
E16 Renovation Nes tunnel. Rock and construction works. Nes tunnel on the E16 in Hole municipality shall be renovated and upgraded to the current standard. This contract is for rock and construction works that shall be carried out in this connection. The tunnel is 1276 m long, cross section T9 and was constructed in 1988. The tunnel is now cleared for all fittings down to the existing road. The water and frost protection arch, technical building and all electro equipment and cables have been removed. A 22kV high voltage cable that is in operation lies under the right (eastern) verge. This shall be temporarily moved over to the other side of the tunnel and later moved back again in this contract, and it will be in operation throughout the construction period. The tunnel shall be upgraded to the current standard for two lane traffic, but shall be improved for being the southbound lanes in a future four lane tunnel. The tunnel cross section shall in principle be kept as it is, but with a possible back-ripping of humps and sections where it is tight for the new water and frost protection and new equipment. NOTE: To register your interest in this notice and obtain any additional information please visit the Doffin Web Site at http://www.doffin.no/Search/Search_Switch.aspx?ID=260338. CPV: 45000000. ...
NO-Bergen: building construction work
Nattland School - temporary teaching pavilions - turnkey contract. A temporary pavilion shall be constructed by Sædalen School, consisting of removable modules on 2 levels, based on the attached drawings from award authority. Foundations and ground work are also included. It is assumed that when it comes to the suggested layout the supplier/contractor can deliver a pavilion that is almost identical to the drawings from award authority. The modular building will be approx. 3 000 m2 gross area, and should be approved for school use in regards to the Planning and Building Act (TEK 10), the Health Act (Regulations on environmental health) and the Working Environment Act, in addition to other relevant legislation (including legislation for technical installations that are not covered by the above laws). The building shall be equipped with a balanced ventilation system with heat exchanger, electric heating, WHS installations/installations that are connected to public water and sewer systems, lighting systems, indoors and outdoors, IT systems in accordance with award authority's specifications and SD plant. In addition, there shall be a fire alarm system (adapted to hearing impaired), loop and burglar alarm. Further description in the form of requirement specification / functional description of the assignment will be dispatched to qualified suppliers after the pre-qualification is completed. The modules must be structured so that they can be divided up and removed later on. The supply comprises purchase of the pavilion. Award authority will apply for framework permit on the basis of attached drawings. The role of a responsible applicant as well as the responsibility until handover / guarantee period will be transferred to the supplier/contractor in connection with the application for building permit. NOTE: To register your interest in this notice and obtain any additional information please visit the Doffin Web Site at http://www.doffin.no/Search/Search_Switch.aspx?ID=260255. CPV: 45210000, 71320000. ...
NO-Trondheim: laboratory reagents
Market research to find out if there are multiple suppliers of the following instrument: A fullly automatic analyser with Luminex technology. CPV: 33696500, 33100000. ...
NO-Oslo: estate and saloon cars
Leasing of administrative cars. The contract is for leasing administrative vehicles for the stated departments. Administrative vehicles means standard cars without police uniform. The extent is from small cars to 17 seat buses. The notice is also for no-emission vehicles. The leasing period is 3 years or more. Note: To register your interest in this notice and obtain any additional information please visit the Doffin Web Site at http://www.doffin.no/Search/Search_Switch.aspx?ID=256695. CPV: 34111000, 34114400. ...
NO-Lillehammer: occupational clothing, special workwear and accessories
Tender 2012022093 Jackets and trousers M/02 Membranes and maritime clothing. Procurement of jackets and trousers M/02 for the Armed Forces and Police's Computing and Material Service. Maritime clothing, jackets and trousers for the Armed Forces. NOTE: To register your interest in this notice and obtain any additional information please visit the Doffin Web Site at http://www.doffin.no/Search/Search_Switch.aspx?ID=260314. CPV: 18100000. ...