DK-Copenhagen: bridge renewal construction work
Wrapping and dehumidification of suspension bridge main cables. The works will comprise supply and installation of a main cable dehumidification system on the Great Belt East Bridge. The 2 main cables of the East Bridge have a diameter of 0,82 m and a total length of 2 965 m each. The works also include provision and installation of temporary access facilities on the main cables. The contractors tender shall be based upon a detailed design provided by the client. CPV: 45221119, 45331211. ...
UK-London: architectural, construction, engineering and inspection services
Paddington Green Campus - Maintenance & Repair Services. The City of Westminster College intends to appoint a Contractor for the maintenance of the Mechanical & Electrical systems and plant (excluding lifts) at its new Paddington Green facility. The new 220 500 sqft building was completed in December 2010. It includes ground to sixth floor plus a basement within a reinforced concrete frame over piled foundations. External aspect is 50 % floor to ceiling glazing, 50 % thermo/acoustic panelling. Internal finishes comprise of demountable acoustic partition, dressed concrete and glazed walls. Raise access flooring throughout with exception of ground floor workshops over floated concrete slab. Features are fresh air cooling and heating via swirl diffusers in plenum flooring controlled by 17 AHU's. Trench heating to curtain walls, CHP as lead boiler backed up by three gas boilers. Simmtronic lighting controls, detection led lighting control with radio switched overrides. Rainwater harvesting through green roof technology. Atmospherically controlled ETPFE cushion atrium roof with louvered smoke venting to Atrium. Diesel fuelled back-up generator for eight hours to building life support systems. Diesel fuelled Sprinkler pumps. Extract ventilation to WC's, workshops and fume cupboards. Radiant panel heating to two workshops. 9 number IT pods constructed of timber frame and glazing with fan coil units providing cooling. Large kitchen/dining area on third floor, small coffee shop to ground floor. Security is provided by extensive CCTV system with 101 cameras including six to external areas. Access control system with semi-smart card control. Speed gates at ground floor level. The college building stands in its own grounds with a service road to the east elevation controlled by semi-automatic barrier and hailing post. The building is approximately north to south orientated with most of the Air handling units and chillers and plant on the roof. CPV: 71000000, 71300000, 71330000, 71334000. ...
UK-London: works for complete or part construction and civil engineering work
Atherton leisure centre. London Borough of Newham (the contracting authority) wishes to appoint a suitably experienced economic entity (that could be a consortium) to deliver a new or refurbished public leisure facility (including swimming pools, health and fitness and other facilities), housing and potentially other uses incorporated on the site of the Atherton Leisure Centre, 189 Romford Road, London E15 4JF, UNITED KINGDOM. The successful economic entity will be responsible for the design, planning, construction (including enabling works and potentially demolition and site clearance) of the entire development and long term management or disposal of non-leisure elements that will be constructed through appropriate land agreement of part or all or the contracting authority's land interests. The contracting authority has freehold title over the entire site and is willing to consider granting the successful economic entity a leasehold interest as part of the contract for such period as is commensurate with whatever is constructed on the site. The contracting authority will contribute financially to the cost of the leisure centre but the successful economic entity will be expected to provide a solution that achieves best consideration for the contracting authority's land, including the potential for the contracting authority to receive an initial upfront capital payment and/or to share in the value generated by the non-leisure uses. At the time of placing this notice the regeneration of the centre is subject to a public consultation exercise the results of which will not be known until the end of March 2012. The principal focus of the Contracting Authority is for the establishment of a modern fitness and leisure facility for the residents of the area. Without preempting the consultation, the Contracting Authority considers there are 2 options being (A) thought to be the most economic option involving demolition of the Centre and construction of a new fit for purpose leisure centre along with housing and potentially other commercial elements (B) the other option of refurbishment of the existing structure, which could potentially include redevelopment of some parts of the building, perhaps with potential to accommodate some residential development or other uses subject to an acceptable design solution. The Contracting Authority will issue to economic entities who pass the PQQ stage a development brief which will confirm whether option A or B is required. The development brief will also set out a number of principles and specifications which the development will be required to meet. A draft of the development brief is available to organisations registering at http://nectr.newham.gov.uk/supplierselfservice (see Section VI.3 for details of how to register). Further information about the project is available at www.newham.gov.uk/athertonprocurement. CPV: 45200000, 45210000, 45211000, 45211350, 45211360, 45212000, 45212100, 45212110, 45212212, 45212220, 45212290, 45453000, 45453100, 45110000, 45111000, 70110000, 70111000, 70112000, 71000000, 71200000, 71220000. ...
UK-Abingdon: helium
Divertor Cryopumps. CPV: 24111300. ...
UK-Ashton-under-Lyne: electricity
New Chartred Housing Trust Limited electricity, gas and smart meter contracts. Coal gas, mains gas or similar gases. Electricity. Electronic Automatic Meter Reading (AMR). New Charter Housing Trust is seeking to establish a contract for the following: Lot 1: Half Hourly Metered Electricity supply. A fixed price contract for the provision of electricity supplies for a period up to 36 months and no less than 12 months for a period commencing 1.6.12. There are approximately 2 half hourly electricity supplies with an approximate annual demand of 836 329 kilowatt hours (kWh). Further information and final site details will be provided to applying suppliers in the invitation to tender (ITT). Lot 2. Non Half Hourly metered electricity supply. A fixed price contract for the provision of electricity supplies for a period of up to 36 months and no less than 12 months for a period commencing 1.6.12. There are approximately 550 non half hourly electricity supplies with an approximate annual demand of 9241 MWh. Further information and final site details will be provided to applying suppliers in the invitation to tender (ITT). The customer will consider the division of HH and NHH across different suppliers and therefore tender responses should be made to reflect this. The customer reserves the right to award the HH and NHH supply to either a single supplier or to different suppliers, depending on the outcome of the evaluation of the tender responses that it receives. Lot 3. Gas supply. A fixed price contract for the provision of gas supplies for a period of up to 36 months and no less than 12 months for a period commencing 1/6/12. There are approximately 47 gas supplies with an approximate anual demand of 10,645 MWh. Further information and final site details will be provided to applying suppliers on the invitation to tender (ITT). The customer will consider the division of gas and electricity supplies across different suppliers and therefore tender responses should be made to reflect this. The customer reserves the right to award the gas and electricity supply to either a single supplier or to different suppliers, depending on the outcome of the evaluation of the tender responses that it receives. Lot 4. "Smart" meter services. Both purchase and lease options are sought for a 5 year term for supply and maintenance of "Smart" meters for the above electricity and gas supplies not covered by half hourly or daily read meters. An integrated service package is sought to incorporate meter hardware provision, meter operator services (maintenance), data collection services (DC), data aggregator services (DA) and data services (online access to read information). The customer shall not seek to consider separation of these services and therefore tender responses should reflect this. The customer reserves the right to award the gas, electricity supply and Smart meter services to either a single supplier or to different suppliers dependent upon the evaluation of the tender responses that it receives. CPV: 09310000, 09121200, 38554000, 50411300, 38551000, 50411200. ...
UK-Reading: haemodialysis devices
Supply of Haemofiltration Machines and consumables. Haemodialysis devices. Up to 4 Haemofiltration Machines and the consumable products required. CPV: 33181100. ...
SE-Stockholm: radio, television, communication, telecommunication and related equipment
Microwave Antennas for the 2-23 GHz bands. The Swedish Defence Materiel Administration (FMV) will purchase Microwave Antennas, preferably COTS equipment (Commercial of the Shelf), to be used in the Swedish Defence Telecommunication Network (FTN). The Microwave Antennas shall operate in the frequency bands from 2 GHz to 23 GHz. This procurement concerns a frame work agreement. This means that this procurement itself will not lead to any deliveries. The frame work agreement shall be valid until 30.4.2015. CPV: 32000000. ...
UK-Bristol: furniture
Supply and Delivery of Ships Accommodation Stores. Furniture. The Fleet Wide Equipment – Training Stores and Boats (FWE-TSB) team has a possible future requirement for the Supply and delivery of Ships Accommodation Stores. It is anticipated that there will be approximately 300 line items in total. It will be an essential feature of any resultant Contract (s) for supplier(s) to be able to source products not normally held as stock or within their normal product range. The range of items for this potential contract will include: laminates, first aid boxes, bunk straps, command chairs and security containers. Reverse Auction: Yes. Estimated Value of Requirement: 6 000 000,00 GBP. QA Standards: BS EN ISO 9001:2008 3rd Party Certification accredited/recognised by UKAS with an appropriate scope to meet the requirement. Pre-Qualification Information to be provided: potential Applicants wishing to register an interest in the project must provide their notification of expression of interest in writing including detailed statements against all the technical selection criteria listed below. Applicants who have completed Part 1 of a PQQ in the last 6 months are to declare this in the expression of interest and are only to provide technical criteria information or, if Applicants have not recently submitted or have not completed Part 1 of a PQQ before, Applicants must submit a response to Part 1 of the PQQ which can be found through the following website: www.mod.uk Once you have gained access o the AOF – Commercial Toolkit you will need to follow the step below to find the PQQ: — Contracting methods. — Supplier relations development & management. Scroll down to the bottom and under further reading select: — Supplier selection topic. Scroll down to the bottom and under related documents select: — Annex A – Model Pre-Qualification Questionnaire. Any additional supporting documentation should be directly relevant and be kept to a minimum. The submitted responses must follow exactly the order the criteria are set out. Failure to submit the requested information may result in the application not being considered further. It should be noted that a Pre-Qualification Questionnaire shall not be issued following this request for expressions of interest. Applicants will be down selected to tender on the basis of the response/evidence provided in their expression of interest and the technical selection criteria stated below which carries the weightings specified. The Authority's aim is to short-list no more than six companies to receive an ITT to ensure that the potential maximum number of received tender responses is manageable for the given tender evaluation period. MOD Contacts: potential suppliers should submit an expression of interest including the required information to Cheryl Brown (E-mail: desshipsfwe-tsb-comrcl4e@mod.uk) by 12:00 on 29.3.2012. Additional information: expressions of interest received after the above date and time will not be considered. The decision of the Authority is final. This announcement should not be construed as confirmation that a tender will be subsequently issued. Technical criteria: technical selection criteria for down-selection for ITT shall be based on a marking scheme. A percentage weighting shall be applied to each of the technical criteria as shown and responses scored as follows: Question number question title weighting %. 1 Meeting the requirement 30. 2 Sub-contractors 15. 3 Continuous improvement / value for money 15. 4 Quality assurance 15. 5 Project risk management 10. 6 E-Commerce 10. 7 Sustainable procurement 5. Scoring guidance: (This will be used for all questions above). Assessment: experience score. Excellent: the applicant has provided the Authority with a high level of confidence that the requirement could be met: 3. Satisfactory: the applicant has provided the Authority with sufficient confidence that the requirement could be met: 2. Barely acceptable: the applicant has provided the Authority with a high level of confidence that the requirement can be met, however some work is needed: 1. Not acceptable: the applicant has failed to demonstrate to the Authority that they have to capability to meet the requirement: 0. Responses required: Question title question size of response. Meeting the requirement: please provide your proposed strategy for meeting the requirements of an enabling arrangement for the supply of and delivery of general electrical spares. Information should address the DE&S supply chain aspects. Maximum of 1 500 words. Sub-contractors: please explain how your supply chain operates and its monitors to maximise optimum performance maximum of 1 000 words. Continuous improvement/ value for money describe the processes/procedures/techniques your company adopts to ensure that value for money is continuously delivered and customer requirements are consistently achieved or exceeded. Maximum of 1 250 words. Quality assurance: a. Please provide copies of your current certificates. In the event that no ISO certification is held, you must be able to demonstrate that you operate and maintain a business/quality management system acceptable to the Authority within the same scope. b. You are required to provide details of the procedures you have in place to identify and record non-compliant work (in terms of quality) and to subsequently implement corrective and preventative actions. c. You are required to provide details of how you notify sub-contractors of prime contract Quality Assurance conditions. Maximum of 1 250 words. Project risk management: please provide details of your experience of project risk management over the last 3 years. Maximum of 1250 Words. E-Commerce: describe what part e-commerce plays in your business and whether you are set up to trade using P2P or if you would be prepared to trade using P2P. Maximum of 1 000 words. Sustainable procurement: describe areas where you have incorporated sustainable procurement in your corporate strategy, as well as your supply chain. Maximum of 1 000 words. CPV: 39100000. ...
UK-Normanton: furniture
"Mental health furniture". Furniture for use in mental health environments including but not limited to: — single seater chairs, — 2 seater settees, — 3 seater settees, — arm chairs, — tub chairs, — high backed chairs, — dining room chairs, — dining room tables, — occasional tables, — wardrobes, — chests of drawers, — bedside cabinets, — box base beds. CPV: 39100000, 39112000, 39113000, 39113200, 39114100, 39113100, 39120000, 39143000, 39143210. ...
UK-Preston: concrete products
LCCG - supply of precast concrete retaining wall units - Farington HWRC. Supply of precast concrete retaining wall units - Farington HWRC. CPV: 44114200, 44114000. ...