IRL-Dublin: construction works for power plants and heating plants
Technical dialogue for wave energy project (PG108T810). The purpose of this PIN is to seek out suitable developed wave energy technology with a view to drawing up a technical specification for ocean wave electricity generation based upon leading technologies which are almost ready for pre-commercial ESB wave energy projects. Interested parties should respond to the briefing document available to download from www.etenders.gov.ie. CPV: 45251000. ...
CY-Nicosia: lanterns
Tender no. 034/2012 - supply of HPS street lighting lanterns. Supply of high pressure sodium street lighting lanterns. CPV: 31527210. ...
SE-Stockholm: cranes
Ship unloader cranes for forest fuels CHP KVV8 Värtan. Ship unloader cranes for bio mass combiend heat and power plant (boiler needs approx. 12 000 m3 / day) with discharge hoppers. The cranes will work on a pier with dimensions; length 200 m and with rail span proposed to be 16 m. CPV: 42414100, 42414110, 42420000. ...
IRL-Dublin: fuel oils
Supply of Engine, Transmission Lube Oil and Grease to Dublin Bus and Bus Eireann. This PQQ relates to the qualification system for inclusion on a tender panel for the supply of Engine, Transmission Lube Oil and Grease to Bus Éireann and Dublin Bus, hereafter known as the contracting authorities. This contract may be awarded in lots. The Contracting Authority reserves the right to extend this contract(s) for a further period of 12 or 24 months. The purpose of the Pre-Qualification Questionnaire is to obtain sufficient information to enable the Contracting Authority to evaluate the suitability of applicants with the necessary resources and capacity to achieve the contract objectives. This will be a negotiated procedure. NOTE: To register your interest in this notice and obtain any additional information please visit the eTenders Web Site at http://www.etenders.gov.ie/Search/Search_Switch.aspx?ID=403652. CPV: 09135000, 09211000, 09211400, 09211600, 09211900. ...
IRL-Tullamore: plastic products
Polythene Film for Stock Pile Covering 2012-14. (Contract period up to 3 years). Polythene Film for Stock Pile Covering 2012-14. Black UV stabilised polyethylene sheeting - 70μm and 87μm thickness, constituted from virgin polymer. Approx usage 600-1 000 tonnes per annum. Film widths (mtrs): 7.5 - 13. Reel lengths (mtrs): 120, 240, 500. Est. delivery req'mt: 80 % in May, 20 % in Sept. (Contract period up to 3 years). Please use the link provided in order to Register for this tender in the Supplierforce system. https://secure.supplierforce.com/RFXs/External/Register.asp?RFXId=285 This is an online process and once you REGISTER with Supplierforce you will have access to all documents/questionnaires online. Your response must be completed and submitted through the Supplierforce system. CPV: 19520000. ...
SI-Šoštanj: auxiliary plant for use with boilers
Supply and installation of Residues Transport System - lot RT. Design, manufacture, supply, installation and commissioning of plant and equipment for the Residues Transport System for the new 600 MW Unit 6 at thermal power plant Sostanj and training of employer's staff. CPV: 42164000. ...
SI-Šoštanj: auxiliary plant for use with boilers
Supply and Installation of Ammonia Water Storage - Lot AWS. Design, manufacture, supply, installation and commissioning of plant and equipment for Ammonia Water Storage for the new 600 MW Unit 6 at Thermal Power Plant Sostanj and training of Employer's staff. CPV: 42164000. ...
SI-Šoštanj: electricity distribution and control apparatus
Supply and installation of civil installations - lot CI. Supply and installation of civil installations for the new 600 MW Unit 6 at thermal power plant Sostanj and training of employer's staff. CPV: 31200000, 31500000, 35110000, 31700000. ...
IRL-Dublin: oil, petrol and air-intake filters
Supply of filters. The Contracting Authority proposes awarding a contract for the supply for filters for use on Bus Eireann's vehicles for a period of 3 years. The Contracting Authority reserves the right to extend this contract(s) for a further period of 12 or 24 months. The purpose of the pre-qualification questionnaire is to obtain sufficient information to enable the Contracting Authority to evaluate the suitability of applicants with the necessary resources and capacity to achieve the contract objectives. This will be a negotiated procedure. Note: to register your interest in this notice and obtain any additional information please visit the eTenders web site at http://www.etenders.gov.ie/Search/Search_Switch.aspx?ID=390512. CPV: 42913000, 42913300, 42913400, 42913500, 42514310, 34900000. ...
NL-Haarlem: parts of railway or tramway locomotives or rolling stock; railways traffic-control equipment
Electromagnetic brakes ICMm-1/2. NedTrain intends, in fulfilment of an order by NS, to establish a framework agreement to cover the supply of electromagnetic brakes with a first delivery of electromagnetic brakes for material series ICMm-1/2. Rolling stock (87 three-bogie train sets). The scope of supply of this European tender consits of: 1. Complete magnetic brake systems, i.e. control unit, power supply unit and brake unit for 87 three-bogie train sets as an integral delivery; 2. Recommended spare parts, the spare parts must be available for a period of 20 years after the contract completion date, e.g. last delivery. The detailed specifications of the above mentioned scope of supply will be published by NedTrain in the RFP phase. Here under listed you will find a brief description of the system required: System Design. A Magnetic track brake is installed on bogies 3, 4 and 5 (EMg-brake). The EMG-brake is triggered by a rapid braking sequence. This causes the magnetic brake cylinders to be pressurised and the pole shoes are pressed onto the rails. Simultaneously running an electric current through the magnet (-ising) coil of the magnetic brake, causes a magnetic field to be created which boosts the pressure of the pole shoes on the rails. This creates frictional resistance between the magnetic pole shoes and the rails. The pneumatic and electrical control of the electromagnetic brake is derived from the functionality as applied in the ICMm-3/4 rolling stock. The architecture of the EMg brake control on one bogie can be seen here. The magnetic brake installation in the drawing will be installed on 3 bogies. The control, housed in equipment boxes, will be mounted under the train set. System description: Once activated the magnetic brakes are pushed against the rails pneumatically and also electrically powered/boosted. This electrical power is provided by a 24V, 36Ah battery per bogie. The batteries are charged by a battery charger with an input voltage of 3*400V AC. This voltage is supplied by a power converter in the train set. The EMG brake is controlled using two independent methods: 1. Pneumatic. The pneumatic control is fed via a main reservoir (HR) pressure 8.5-10 bar and drives the magnetic pole shoes down when train line pressure (TL) drops. The pneumatic control then drives the electrical power for the magnetic brakes via pressure switches. 2. Electro-pneumatic. A contact in the brake valve in the cabin of the train set gives a switch-on command via the train circuit to the electrical controller. The electrical controller drives an electro-pneumatic valve upon which the train lines are bled causing the magnetic pole. Boundary conditions: — The magnetic coil of the EMg brake is only boosted if the pole shoes are on the rails, — The electrical booster of the EMg brake is switched off at speeds of less than 5km/h, — The EMG brake is switched off both pneumatically and electrically by one stop cock, — The EMG brake can be operated and tested on the spot using buttons on either side of the train set, in de direct vicinity of the corresponding bogie. Interfacing with existing installations/components: Please note that this European tender does not only apply to the ICMm-1/2 material series (project), but is also applicable to any other future refurbishment- and/or upgrade of other material series. These other material series are options, which NedTrain may, at its decretion, can exercise. These options are not only applicable to the normal duration of the contract of 2 (two) years but also to any addendum/extension for a period of 2 years. Candidates can derive no rights from these options. CPV: 34630000. ...