UK-London: construction work
Transforming Tate Modern - BMS & controls - TP 6700. The scope of works associated with the BMS & controls package TP 6700 is the design of a fully open protocol system, manufactured, installed and interfaced to completion inclusive of associated plant and equipment. CPV: 45000000. ...
UK-London: construction work
Transforming Tate Modern - ventilation services - TP 6500. The scope of works associated with the ventilation package TP 6500 is to complete the installation of all general, WC, kitchen and fan coil unit air conditioning and ventilation including associated plant and equipment. The scope is inclusive of full design, manufacture and installation of smoke control and smoke extract systems to completion. CPV: 45000000. ...
UK-London: construction work
Transforming tate modern - sprinkler installations - TP 6200. The scope of works associated with the sprinkler package TP 6200 is to design, manufacture and install dry riser, wet riser and sprinkler (pre-action and wet) installation inclusive of associated plant and equipment to completion. CPV: 45000000. ...
UK-London: construction work
Transforming Tate Modern- Mechanical Services - TP 6300. The scope of works associated with the mechanical installation package TP 6300 is to complete the installation of all mechanical, domestic and public health services inclusive of plant and equipment to completion. The services include Chilled water, Low temperature hot water, Ground water heating and cooling, Domestic hot and cold water services, Recycled rainwater and Above ground drainage. CPV: 45000000. ...
E-Barcelona: road construction works
Site adaptation works. Baseline Contract: Construction of bituminous surfaced areas to form access roads, pedestrian routes, vehicle parking, turning circle for lorries, traffic lanes, bus and truck parking (12 000 to 15 000 m²). Provision of main services to construction company site areas, Infirmary and Canteen i.e. potable water, surface water drainage, wastewater drainage, telecommunications, external lighting, low and medium voltage electricity. Modifications to fencing and new vehicles gates. Supply and installation of provisional fencing (in the range of 1 500 m). Redevelopment of one guardhouse and construction of one new guardhouse. Re-location of existing modular built Infirmary (in the range of 100 m²). Provision and installation of modular built meeting room (50 people) and Site Offices (10 to 20 people). Provision and installation of modular build, fully equipped, canteen including supply and installation of catering and dining equipment to initially cater for between 500 and 1,000 meals per day. Eventual expansion to 2 000 to 3 000 meals per day – see option 3. Extension of Visitors Centre to provide Changing Room for Visitors and additional offices for Tour Organisation. Optional works: Option 1 – critical network 1 – construction trenches 5 to 8 m deep (50 % in rock); 300/600/2 000 mm diameter concrete pipes and electricity ducts (700 to 800 m length). Option 2 – critical network 2 – construction of further trenches 5 to 8 m deep (50 % in rock); 300/600/2 000 mm diameter concrete pipes and electricity ducts (700 to 800 m length). Option 3 – Extension of modular Built Canteen from 500 – 1 000 meals per day to 2 000 -3 000 meals per day. Option 4 – Additional parking to Contractor's area 2 (30 000 to 35 000 m²). Option 5 – Construction of a helicopter pad. CPV: 45233120, 45112100, 45212422, 45232451, 45232411, 45232130, 45223300, 45213311, 44211100. ...
UK-Cromer: pier construction work
Cromer Pier Major Works 2011/12. North Norfolk District Council is to appoint a suitably experienced contractor to carry out the structural renovation of the sub-structure of Cromer's seaside pier. Note, the works do not include the buildings on the pier nor the lifeboat station sub-structure and building at the seaward end of the pier. The sub-structure of the pier, located in a very exposed coastal environment, is to be renovated over a 2 year period. Suitably experienced contractors are invited to submit a formal request to participate by the due date. CPV: 45241300, 45223000, 45223210. ...
UK-Newcastle upon Tyne: office block construction work
Bernicia Group - new build head quarters, PMD and associated external works. Cheviot Housing Associated Limited are looking to procure an organisation to enter into a JCT Design and Build 2005 contract to deliver their New build office accommodation, Planned Maintenance Department (PMD) including workshop, storage and associated offices and amenities and Associated external works at Ashwood Business Park, North Seaton, Ashington. The proposed Office Accommodation will be between 2 000 sqm to 4 000 sqm and a separate PMD which is proposed to be 500 sqm to 1 500 sqm. The successful organisation will be required to deliver all new build elements, associated external works. Bidders will be provided with a design package of information at ITT stage. The Clients Design Team will be novated upon appointment of the successful bidder. Planning approval will be obtained in parallel with this tendering process and this procurement will be dependent upon receiving planning approval. The total estimated value of the works contracts is between 5 000 000 GBP and 7 000 000 GBP. Further information in relation to the proposed works and contract will be available with the PQQ and MOI which will be distributed to all interested organisations upon request. Further detailed tender information will be distributed to short listed bidders at ITT Stage. It is proposed that works will commence on site Quarter 2 2011. It is anticipated that the contract period will be circa 18 months. Note: To register your interest in this notice and obtain any additional information please visit the myTenders Web Site at http://www.myTenders.org/Search/Search_Switch.aspx?ID=78558. CPV: 45213150, 45213100. ...
UK-Redcar: building construction work
UK-Redcar: Filey, North Yorkshire. Coast and Country Housing (CCH) were set up to take over the ownership and management of the housing and ancillary housing assets from Redcar and Cleveland borough Council under a "Large Scale Voluntary Transfer" initiative (LSVT). Creation of the Company followed a successful ballot of the tenants of the council who overwhelmingly votes "yes" to a change of landlord, the promise of substantial investment in their homes and the enhancement of housing services. A total of 11 631 housing units plus a number of related commercial premises, offices and garages were transferred to the Company in July 2002. The Company's principal activity is the provision and management of housing and appropriate support services for people in housing need. As at 31.3.2009 the company had a total housing stock of 10 226 properties available for rent with these being predominantly houses and bungalows all located within Redcar and Cleveland Borough Council area. Approximately 90 % of these properties were built after 1945 with over 50 % built after 1964. In September 2009, the board of CCH unanimously voted to regenerate two of its main estates located in Loftus, East Cleveland, and Redcar, with the outlined density of existing stock dwellings, and the development of new build mixed tenure homes. To support the CCH 5 year development plan, approval was obtained to provide a 100 new build homes per annum, an important element in this delivery is the following scheme: Major residential development, Muston road, Filey, North Yorkshire. The development will incorporate 300 new homes incorporating external works and associated infrastructure. The scheme will provide a range of mixed tenure dwellings consisting of rented, shared ownership and open market sale properties. The aims and objectives are to provide a sustainable flagship development, creating a sense of place resulting in an exemplar scheme for North Yorkshire. Works will commence on site by the end of March 2011. Expressions of interest are sought from suitable experienced house builders and developers with the aim of securing preferred developer partner status early 2011. The preferred partner will enter into a form of development agreement with Coast and Country Housing to deliver the 300 unit scheme within an agreed timescale. Building construction work. Construction work for multi-dwelling buildings and individual houses. Multi-dwelling buildings construction work. CPV: 45210000, 45211340, 45211000. ...
UK-Greenock: building construction work
Port Glasgow Shared Campus. The construction of a new shared campus secondary school and ASN school via a design and build contract with a novated design team. CPV: 45210000, 45214200. ...
UK-Ilford: construction work
Expansion of Loxford School of science and technology through construction of accommodation for school pupils aged 3-11. A Competitive Dialogue process for the Expansion of Loxford School of Science and Technology through construction of accommodation for school pupils aged 3-11. CPV: 45000000, 45100000, 45214210, 45400000. ...